ADA Sidewalk Project 5.80-15

Bid Packet
MFAM Bid 5.80-15 2016.pdf
Adobe Acrobat document [2.6 MB]
Addendum #1
Addendum 1.pdf
Adobe Acrobat document [305.9 KB]
Post Award Packet
MFAM Bid 5.80-15 Post Award Forms and Ag[...]
Adobe Acrobat document [956.7 KB]

Please download both Bid Packet, Addendum #1 and Post Award Packet

 

Pre-Bid Job Walks are scheduled by appointment only.  

Contact Greg Kuster at 951.902.9936 or greg@marchfield.org

ADA Sidewalk Project

March Field Air Museum

Project# 5.80-15

 

PUBLIC NOTICE IS HEREBY GIVEN that Bid Packets for the MARCH FIELD AIR MUSEUM ADA Concrete Sidewalk Installation project will be available for pick-up, email delivery or online at www.marchfield.org on August 9, 2016. Bid Proposals will be received at the office of the March Field Air Museum at 22550 Van Buren Blvd., Riverside, CA 92518 , on September 9, 2016 until 12:00 pm.

DESCRIPTION OF THE WORK:  The Work comprises the Installation of new ADA sidewalks at the Museum to include labor, materials, services, building/encroachment permits and equipment necessary or reasonably incidental to the construction of new ADA sidewalks and removal of existing asphalt pathway.

 

This project is being financed with Community Development Block Grant funds  from the U.S. Department of Housing and Urban Development (24 CFR Part 570) and subject to certain requirements including: compliance with Section 3 (24 CFR Part 135)  Economic Opportunities requirements; payment of Federal Davis-Bacon prevailing wages; Federal Labor Standards Provisions (HUD 4010); Executive Order #11246; and others.  Information pertaining to the Federal requirements is on file with the County of Riverside Economic Development Agency.

 

PREVAILING WAGE: The Federal minimum wage rate requirements, as predetermined by the Secretary of Labor, are set forth in the books issued for bidding purposes, referred to herein as Project Bid Documents (Special Federal Provisions), and in copies of this book which may be examined at the office described above where the project plans, special provisions, and proposal forms may be seen. Addenda to modify the minimum wage rates, if necessary, will be issued to holders of the Project Bid Documents. Additional information pertaining to these Federal requirements is on file with the County of Riverside.  Contractor will be required to show proof of contact with qualified neighborhood(s) and businesses. State Prevailing Wage Rates: Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates, including the per diem wages applicable to the work, and for holiday and overtime work, including employer payments for health and welfare, pension, vacation, and similar purposes, in the County of Riverside in which the work is to be done, have been determined by the Director of the Department of Industrial Relations, State of California. Federal and State Prevailing wage rates will apply.

 

March Field Air Museum

22550 Van Buren Blvd.

Riverside, CA 92518

 

Greg Kuster, Operations Manager

951.902.9936

greg@marchfield.org